Operation - Siemens Simotics M-1FE1 Series Hardware Installation Manual

Synchronous built-in motors for sinamics s120
Hide thumbs Also See for Simotics M-1FE1 Series:
Table of Contents

Advertisement

Operation

8.2 Operation
8.2
Operation
Note
EMERGENCY OFF
To avoid accidents, inform yourself about the EMERGENCY OFF function before you switch
on the system.
The motor is switched on and off using the converter.
● Read about this topic in the converter operating instructions.
Before switching on
● Ensure that the converter is correctly parameterized.
● Switch on the cooling system.
Switching on
1. Switch-on the motor at the converter.
2. Ensure smooth motor operation.
3. Check the function of the motor cooling system.
4. Check the function of the safety equipment.
5. Check whether the motor reaches the required parameters
The motor is switched on.
Operation
While the motor is operating, ensure that the specified parameters are maintained.
Observe the following during operation:
● The power consumption lies in the specified range.
● The motor is cooled.
– With water cooling: Check the liquid level and coolant circulation.
– With air cooling: Check that the heat can dissipate freely.
● The motor runs without any unusual noise.
● The motor temperature lies in the specified range.
Note
Observe the maintenance intervals
Maintain the motor as specified in the project specifications of the spindle manufacturer.
Switching off
● Switch-off the motor at the converter.
132
1FE1 synchronous built-in motors
Hardware Installation Manual, 12/2016, 610.43000.40b

Advertisement

Table of Contents
loading

Table of Contents