7 Operation
7.5 Maintenance
Click Browse...
The Choose File to Upload dialog opens.
Fig. 7-49
Select the desired update (extension .pck) in the directory.
Click Open.
The selected path is inserted in the input/output window, figure 7-48, into the Browse... field.
Click Open.
After approx. 2 s, the message Action was successful! is displayed in the input/output window.
Device firmware, default set of parameters, text libraries, HTML files or parts thereof are uploaded within
one minute.
The device then restarts automatically.
NOTE
Do not switch off the supply voltage during the upload process as this can lead to data loss.
7.5.2

Calibration

The chapter 10 gives a detailed description of the calibration of the measuring ranges of alternating voltage,
alternating current, and voltage in the neutral conductor (V
measurement setup and the
calibration procedure.
132
Choose File to Upload Dialog
). It explains the
N
SICAM MMU 7KG9663, Device Manual
E50417-H1040-C514-A3, Edition 01.2016

Advertisement

Table of Contents
loading

Table of Contents