Remote Location Cabling (Phases 1 And 2); Ed-1E434, Group 97 Cable; Figure 40. Ed-1E434, Group 97 And 98 Cable; Table T. Ed-1E434, Group 97 Cable Connection(S) (Phases 1 And 2) - AT&T System 85 Installation And Test

Release 2 versions 1, 2, 3, and 4. remote module and remote group interface
Hide thumbs Also See for System 85:
Table of Contents

Advertisement

Remote Location Cabling (Phases 1 and 2)
ED -1E434, Group 97 Cable
Install the ED -1E434, Group 97 cable(s) (Figure 40) from E56 on the module control (00)
backplane to connector El on the ZAEY1 circuit pack (ED -1E469, Group 2 Extended MAAP
Bracket) for each remote module as shown in Table T.
TABLE T. ED-1E434, Group 97 Cable Connection(s) (Phases 1 and 2)
ORIGINATION
CONNECTOR
DESTINATION
CONNECTOR
Module
Control(00)
Backplane
E56
ZAE Y1
(Extended
MAAP
Bracket)
El
GROUP 97-61 INCHES
r
_ GROUP 98-72 INCHES
E56
AMP 1-102935
COVER 103058-8
COVER 103056-8
252A CABLE
id
6 PAIR
24 GAUGE
100849892
GROUP 97-El
GROUP 98-E2
AMP 1-102935
COVER 103058-8
COVER 103056-8
Figure 40. ED -1E434, Group 97 and 98 Cable
Page 61

Advertisement

Table of Contents
loading

Table of Contents