ED -1E434, Group 9, 137, 138, and 139 Cables
Install the ED -1E434, Group 9, 137, 138, and 139 cables (Figure 32) from E07 on the RMI
carrier(s) backplane to connector El, E2, E3, and E4 on the ZAE Y2 circuit pack (ED -1E469,
Group 4 Extended MAAP Bracket) as shown in Table N. One cable connection is made for
each RMI carrier.
TABLE N. ED-1E434, Group 9, 137, 138, and 139 Cable Connections (Phase 2)
ORIGINATION
CONNECTOR
GROUP
DESTINATION
CONNECTOR
RMI
Carrier
Backplane
(Position 00)*
E07
9
ZAE Y2
(Extended
MAAP
Bracket)
El
RMI
Carrier
Backplane
(Position 01)*
E07
137
ZAE Y2
(Extended
MAAP
Bracket)
E2
RMI
Carrier
Backplane
(Position 02)*
E07
138
ZAE Y2
(Extended
MAAP
Bracket)
E3
RMI
Carrier
Backplane
(Position 03)*
E07
139
ZAE Y2
(Extended
MAAP
Bracket)
E,4
* Used only if RMI carrier is equipped in that position.