Loose Wiring
Install the cable connections in the module control cabinet as shown in Table L. These
connections are needed to connect the ZAE Y2 circuit pack to the bus bar —48 V and bus -bar
ground through the MAAP circuit breaker.
TABLE L. Loose Wiring Connections (Phase 1)
ORIGINATION
CONNECTOR
CABLE
DESTINATION
CONNECTOR
MAAP
Circuit
Breaker
"Line
Side"
GROUP 4
H600-161
BUS BAR
—48V
N/A
ZAEY2
(Extended
MAAP
Bracket)
PL 1
GROUP 5
I-1600-161
BUS BAR
GRD
-
N/A
ZAE Y2
(Extended
MAAP
Bracket)
PLO
GROUP 6
H600-161
MAAP
Circuit
Breaker
"Load
Side"