Ed-1E434, Group 96 Cable; Table W. Ed-1E434, Group 96 Cable Connections (Phases 1 And 2) - AT&T System 85 Installation And Test

Release 2 versions 1, 2, 3, and 4. remote module and remote group interface
Hide thumbs Also See for System 85:
Table of Contents

Advertisement

ED -1E434, Group 96 Cable
Connect ED -1E434, Group 96 cable (Figure 42) from MAAP on the ED-1E469, Group 2
Extended MAAP Bracket (Figure 18) to connector E 5 7 on the backplanes of both module
control carriers with legs E57A and E57B. Leg E57B connects to module control carrier (00),
and leg E57A connects to module control carrier (01).
Note: Leg E57A is used for duplicated module control systems only.
Install the other legs from the ED-1E434, Group 96 cable from MAAP on the Extended
MAAP Bracket to PLO, PL1, Bus -Bar Ground, and the MAAP Circuit Breaker Load
Side, respectively, for each remote module as shown in Figure 42 and Table W.
TABLE W. ED-1E434, Group 96 Cable Connections (Phases land 2)
ORIGINATION
CONNECTOR
CABLE
DESTINATION
,
CONNECTOR
ED-1E469
Group 2
(Extended MAAP
Bracket)
MAAP
GROUP 96
Module
Control
Carrier (01)
E57A
ED -1E469
Group ?
(Extended MAAP
Bracket)
MAAP
GROUP 96
Module
Control
Carrier (00)
E57B
•••
ED-1E 469
Group 2
(Extended MAAP
Bracket)
MAAP
GROUP 96
(24-Gauge
Black Wire)
ZAE Y1
(Extended
MAAP
Bracket)
PLO
ED-1E469
Group 2
(Extended MAAP
Bracket)
MAAP
GROUP 96
(24-Gauge
Red Wire)
ZAEY1
(Extended
MAAP
Bracket)
PL1
ZAE Y1
(Extended
MAAP
Bracket)
PLO
GROUP 96
(22 -Gauge
Black Wire)
BUS BAR
GRD
N/A
ZAE Y1
(Extended
MAAP
Bracket)
PL1
GROUP 96
(22-Gauge
Red Wire)
MAAP
Circuit
Breaker
"Load
Side"
Page 64

Advertisement

Table of Contents
loading

Table of Contents