Procedure For Connecting And Setting Up; Preparation - Panasonic MEWNET-F Technical Manual

Remote i/o system
Table of Contents

Advertisement

5.3 Procedure for Connecting and Setting Up

The connection and setting procedure of teh remote I/O system [MEWNET-F] is described as follows.

5.3.1 Preparation

Turn OFF all power supply to devices.
Configure the master stations and slave stations.This section describes an example of the procedure
using the following 4 stations.
Install each station at prescribed positions.
Configure a system which perform the remote I/O control with a master unit, 3 stations, 5 slots and 128
I/O points.
This CPU controls the normal I/O area and remote I/O area with totally 8 slots and 176 I/O points.
Reference: For information on the onstallation of master station system and slave station system,
<FP3/FP10SH/FP10S Hardware Manual ARCT1F300E-1>
Master Station (Master Unit)
Slave station
Note:
If the system is not properly configured, an error will be detected when the power turned on.
[E35] There are units which cannot be installed on a slave station system.
[E36] Number of slots or number of I/O points is out of range.
Max. 4 units/1 CPU
Per 1 master unit (1 path)
- Max. 32 stations
- Max. 64 slots
Per 1 CPU
- Max. 128 slots
5-5

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents