Brief Instructions On Commissioning The 1Count5V - Siemens SIMATIC ET 200S Operating Instructions Manual

Hide thumbs Also See for SIMATIC ET 200S:
Table of Contents

Advertisement

3.3

Brief instructions on commissioning the 1Count5V

Task
These instructions guide you to a functioning application that will enable you to count the
pulses of an encoder and become familiar with and check the basic hardware and software
functions of your 1Count5V. The counting mode used in this example is "Count
continuously".
Requirements
The following requirements must be satisfied:
● You must have put an ET 200S station on an S7 station with a DP master into operation.
● You must have the following:
Installation, Wiring and Fitting
1. Install and wire the TM-E30S44-01 terminal module (see Figure).
2. Plug the 1Count5V into the terminal module. Detailed instructions are provided in the
Technological Functions
Operating Instructions, 06/2010, A5E00124867-07
– A terminal module (e. g. TM-E30S44-01)
– A 1Count5V,
– A 5 V encoder with a 24 V encoder supply and the material required for wiring
ET 200S Distributed I/O Device
(http://support.automation.siemens.com/WW/view/en/1144348) operating instructions.
Figure 3-1
Terminal Assignment for the Example
3.3 Brief instructions on commissioning the 1Count5V
1Count5V
123

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents