Cleveland SteamCraft 10 Service Manual page 120

Convection steamer
Table of Contents

Advertisement

Page 114
SteamCraft 10 Service Manual, Chapter 6
YES (Continued)
IT:1-6 Does the blowdown cycle last for three minutes?
Phase 1 testing is complete. Proceed to Phase 2 testing.
Printed 3/93
4. If the 3-way valve is functioning properly, check the steam generator water fill
solenoid valve and associated plumbing for blockage.
5. If the water fill plumbing and valve are not blocked, refer to component test
CT:4 and test the water fill solenoid valve.
NOTE: The 3-minute timer stops the blowdown cycle approximately three minutes
after starting the blowdown cycle. Watch the float rinse nozzle and the drain pipe to
floor drain gap. Three minutes after switching the main disconnect to the ON
position, there should be no water flow at either point.
If the blowdown cycle has stopped before the above test sequence is complete, the
cycle can be restarted by switching the ON/OFF switch to the ON position and back
to the OFF position.
Test the 3-Minute timer according to component test CT:2.
NOTE: If the components of the upper and lower compartment and steam generator
groups were not examined simultaneously during Phase 1, repeat the tests for the
components not yet tested.
Models 24-CGA-10 and 24-CEA-10
Cleveland Ranges, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

24-cea-1024-cga-1024-cgp-1024-cep-10

Table of Contents