Mitsubishi MELSEC-WS0-CPU0 User Manual page 74

Safety controller
Table of Contents

Advertisement

Chapter 6
Figure 22:
Mounting the module onto
the DIN mounting rail
Figure 23:
Installing end clips
71
Mounting/Dismantling
 Make sure that the voltage supply of the MELSEC-WS safety controller is
switched off.
 Hang the device onto the DIN mounting rail (1)).
 Ensure that the earthing spring contact is positioned correctly (2)). The earthing
spring contact of the module must contact the DIN mounting rail securely to allow
electrical conductivity.
 Snap the module onto the DIN mounting rail by pressing it lightly in the direction
of the arrow (3)).
 If there are several modules, slide the modules together individually in the
direction of the arrow until the side plug connection latches in.
 Install end clips on the left and right.
The following steps are necessary after mounting:
 completing the electrical connections
 configuration (See the Safety Controller Setting and Monitoring Tool Operating
Manual.)
 checking the installation

Advertisement

Table of Contents
loading

Table of Contents