Touchpoint Pro Battery Box - Honeywell touchpoint Pro Operating Instructions Manual

Hide thumbs Also See for touchpoint Pro:
Table of Contents

Advertisement

MAN0923_Issue 3_04/15
Touchpoint Pro
Operating Instructions
8. Maintenance
10. When ready press OK and apply gas to the sensor
Figure 8.12 Apply Span Gas
11. View the reading until it is stable, and then press Accept
12. Confirm that the gas reading is correct, and press Save then OK
13. Remove the span gas from the sensor, and confirm that the gas reading has returned to zero
14. Select Clear Inhibit to remove the inhibit from the channel

8.10 Touchpoint Pro Battery Box

8.10.1 DC-UPS LED Indications
The DC-UPS module has a range of LEDs that indicate UPS system states, as listed both on the DC-US
module cover, and in the table below. These LEDs should be checked regularly and before isolating the
battery or mains power supplies.
Note: TPPR batteries are replaced as a pair, 'Battery Center Tap' is not used, and individual status is not
shown.
126

Advertisement

Table of Contents
loading

Table of Contents