Input Shaft (5 Speed) - Husqvarna TE 250-310 2012 I.E. Workshop Manual

Table of Contents

Advertisement

ENGINE REASSEMBLY
TE 250 - 310 2012 I.E. / TE 250 - 310 2012 I.E. USA
TC 250 2012 - TC 250 2012 I.E. USA
TXC 250 - 310 2012 I.E. USA

Input shaft (5 SPEED)

Fit roller cage (1) and 5th gear (2) on the bushing and then install the washer
(3) and the retaining ring (4). The washer must be placed between gear and
retaining ring. Fit 3rd gear (5), retaining ring (6) and washer (7).
Fit the roller cage (8).
Fit 4th gear (9).
Fit 2nd gear (10).
Fit the circlip (11).
B: with 5th gear engaged
C: with 4th gear engaged
D: lubricate with MOLYKOTE G-n plus
Workshop Manual Ed. 12-2011
H.18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2012Tc 250 2012 i.e. usaTxc 250-310 2012 i.e. usa

Table of Contents