Husqvarna TE 250-310 2012 I.E. Workshop Manual page 238

Table of Contents

Advertisement

TE 250 - 310 2012 I.E. / TE 250 - 310 2012 I.E. USA
Workshop Manual Ed. 12-2011
FRONT SUSPENSION
TC 250 2012 - TC 250 2012 I.E. USA
TXC 250 - 310 2012 I.E. USA
Pull the piston rod until fully extended.
Check oil level. It should be about 145 mm (5.7 in.).
H06843
Push the piston rod all the way down and install the bottom valve assembly.
With the bottom valve assembly installed, check that the piston rod is fully
extended.
H06844
Hold the cartridge octagonal nut to prevent rotation.
Use a similar tool in the octagonal recess of the bottom valve assembly.
Tighten the bottom valve assembly to 29 Nm (21.4 ft/lb) using a wrench.
H06845
Hold the cartridge with the piston rod end pointing downwards as shown in the
figure.
Pump the piston rod up and down a dozen times to help oil reach all points of
the unit.
H06847
I.14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2012Tc 250 2012 i.e. usaTxc 250-310 2012 i.e. usa

Table of Contents