16. Torque the locking screw to specification.
Snorkel Locking Screw:
10 ft-lb (14 Nm)
Transmission Assembly
NOTE: The snorkel shaft and pinion shaft must
be installed prior to transmission assembly. The
snorkel
shaft
cannot
assembling the transmission.
17. Clean both transmission case halves thoroughly.
Inspect case half mating surfaces for damage.
18. Install shift fork (S) and torsion spring into
transmission housing as an assembly. Load spring
as shown in image below
be
installed
after
9924874 R02 - 2014 RZR XP / XP 4 1000 Service Manual
© Copyright 2013 Polaris Industries Inc.
TRANSMISSION
19. Apply Loctite
®
242
™
to (2) screws (T) and install with
retaining
plates
over
specification.
Shift Fork Screws:
10 ft-lb (14 Nm)
20. Slide engagement dog (U) onto retaining pins of shift
fork.
shift
fork.
Torque
to
8
8.39