Cutting The Rail - Harmar Mobility Vantage SL400 Installation And Service Manual

Hide thumbs Also See for Vantage SL400:
Table of Contents

Advertisement

CUTTING THE ALUMINUM RAIL
One Rail Installation (96 Inches or less)
1. Determine if the lift will be installed on the right or
left side of the staircase. [Figure 9-1]
When deciding on which side of the staircase to install
the lift, consider:
Which side offers access to an electrical outlet?
Which side has protruding obstructions such as
handrails or wall or window trim?
Is there a doorway at the top or bottom?
2. Determine top and bottom of rail. The teeth of the
gear rack must face toward the wall nearest to where
the lift will be installed.
3. Remove the charge strips and wiring from the rail.
4. Cut the rail to length.
5. Replace charge strips in both ends of the rail routing
the wire through the main interior channel. [Figure 9-2]
Before cutting the rail, remove the
gear rack, charge strips and wire
from the rail.
CAUTION
When removing the gear rack DO NOT
remove the screws from the gear rack. If
you do, the fastening plate will become
lost within the channel and the gear
TIP
rack will need to be removed.
TEC0017 23Jan2015 P/N: 630-00027-01 revC
PREPARATION - CUTTING THE RAIL
Vantage Stair Lift
MAIN INTERIOR CHANNEL
SL400 • Vantage Stair Lift Installation Manual
Figure 9-1
Figure 9-2
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents