Harmar Mobility Vantage SL400 Installation And Service Manual page 11

Hide thumbs Also See for Vantage SL400:
Table of Contents

Advertisement

Three Rail Installation (192¼ -288 inches)
1. Determine if the lift will be installed on the right or
left side of the staircase. [Figure 11-1]
When deciding on which side of the staircase to
install the lift, consider:
Which side offers access to an electrical outlet?
Which side has protruding obstructions such as
handrails or wall or window trim?
Is there a doorway at the top or bottom?
2. Determine top and bottom of rail. The teeth of the
gear rack must face toward the wall nearest to where
the lift will be installed.
3. Remove the charge strips and wiring from the rail.
4. Cut the rail to length at the top and bottom ends.
5. Replace charge strips into both ends of the rail
routing the wire through the main interior channel.
[Figure 11-2]
BOTTOM SECTION
SPLICE JOINT
36" MINIMUM CUT LENGTH
Remember to keep the factory cuts
together at the splice joints to assure
the smoothest transition.
TIP
TEC0017 23Jan2015 P/N: 630-00027-01 revC
PREPARATION - CUTTING THE RAIL
Three Rail Configuration
MIDDLE SECTION
96" STANDARD LENGTH
Vantage Stair Lift
Before cutting the rail, remove the
gear rack, charge strips and wire
from the rails that are to be cut.
CAUTION
When removing the gear rack DO NOT
remove the screws from the gear rack. If
you do, the fastening plate will become
lost within the channel and the gear
TIP
rack will need to be removed.
MAIN INTERIOR CHANNEL
SPLICE JOINT
60.25" MINIMUM CUT LENGTH
SL400 • Vantage Stair Lift Installation Manual 11
Figure 11-1
Figure 11-2
TOP SECTION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents