Windhager DuoWIN Assembly Instructions Manual page 17

Wood/pellets
Table of Contents

Advertisement

2.
For the Installer
2.4.2.1 Remove boiler from pallet and transport to installation site
Information!
The base of the boiler is secured to the floor plate by 2 screws positioned on either side – Fig. 8.
a) by hand – Fig. 10–13.
b) with hand cart and tension belt – Fig. 14-15.
c) with eyelet and crane (not included in delivery) – Fig. 16-17.
a) by hand
Fig. 10 Remove 2 screws and the side pie-
ces of wooden frame
Fig. 12 Grip position for auger tube and
flue outlets
b) with hand cart and tension belt
Fig. 14 Secure boiler to pushcart with
tension belt
Fig. 11 Use planks from crate as ramp
Fig. 13 Push boiler off pallet
Fig. 15 14 Lift the boiler off the pallet with
the hand cart
17

Advertisement

Table of Contents
loading

Table of Contents