Omron CJ2 User Manual page 338

Cj series
Hide thumbs Also See for CJ2:
Table of Contents

Advertisement

Appendices
4.
Use wire strippers to remove the insulation from the end of each wire.
5 mm
5.
Wrap electrician's tape over the top and end of the cut sheath.
Soldering
1.
Place heat-shrinking tubes over all wires.
2.
Pre-solder all wires and connector terminals.
3.
Solder the wires.
1 mm
Heat-shrinking tube
(inner dia. 1.5, l = 10)
4.
Move the heat-shrinking tubes onto the soldered area and shrink them into place.
Assembling the Hood
Assemble the connector hood as shown.
FG Connection
Ground plate
A-108
Electrician's tape
Soldering iron
Heat-shrinking tube
No FG Connection
Aluminum foil tape
CJ2 CPU Unit Hardware User's Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cj1-hCj1mCj1

Table of Contents