A-4-5 Wiring Connectors - Omron CJ2 User Manual

Cj series
Hide thumbs Also See for CJ2:
Table of Contents

Advertisement

A-4-5
Wiring Connectors
Use the following procedures to wire connectors.
Preparing the Cable
Lengths for steps in the procedure are provided in the diagrams.
Connecting the Shield Line to the Hood (FG)
1.
Cut the cable to the required length, leaving leeway for wiring and laying the cables.
2.
Use a razor blade to cut away the sheath, being careful not to damage the braiding.
3.
Use scissors to cut away all but 10 mm of the exposed braiding.
4.
Use wire strippers to remove the insulation from the end of each wire.
5 mm
5.
Fold the braiding back over the end of the sheath.
6.
Wrap aluminum foil tape over the top of the braiding for one and a half turns.
Not Connecting the Shield to the Hood (FG)
1.
Cut the cable to the required length, leaving leeway for wiring and laying the cables.
2.
Use a razor blade to cut away the sheath, being careful not to damage the braiding.
3.
Use scissors to cut away the exposed braiding.
CJ2 CPU Unit Hardware User's Manual
40 mm (RS-232C)
10 mm
Aluminum foil tape
40 mm (RS-232C)
10 mm
Appendices
A-107

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cj1-hCj1mCj1

Table of Contents