Pre-Installation Procedures - WaterLogic WL Cube Operating, Installation And Service Manual

Table of Contents

Advertisement

DANGER!
ELECTRICAL SHOCK HAZARD.
Only qualified personnel who have read and understand this entire manual should attempt to install, or
service this unit, failure to do so could result in death or serious injury. DO NOT plug into an electrical
supply until specifically instructed.
WARNING!
ALWAYS SANITIZE BEFORE USE.
Sanitize before use to eliminate any potential microbiological contaminates.
Materials Needed:
• Personal Protective Equipment. Rubber or Nitrile Safety Gloves and Protective Eyewear
• Phillips Screwdriver. Temperature Gauge.
• Water Pitcher or Container to collect water from the faucet
• 5 gallon container or drain basin
• Sanitizer - Household Bleach (5.25% Sodium Hypochlorite) or Citric Acid Based Cleaner
• ¼" Plastic Tubing, at least 4 feet in length, and assorted ¼" quick connect fittings.
• TDS Meter and Test Strips for measuring chlorine. - Optional
• 1/8 NPT Female Thread to ¼" Compression Fitting (Used to connect hose to drain fittings)
1. Unpack the Waterlogic CUBE and check exterior for damage.
WARNING!
CUBE IS HEAVY.
Use proper lifting aids and handling techniques to avoid injury. Use assistance as single person lift
could cause injury. Always drain before handling and transporting and handling to reduce the weight
of the unit.
2. Open the top cover by removing the 2 screws that fix it in place.
3. Visually inspect all electrical connections and power lead.
4. Visually inspect all water connections.
5. Connect to a potable drinking water supply via a ¼" John Guest tube; the supply must be limited to
40-60 psi.
6. Connect the power cord to an appropriate power supply and the machine.
7. Turn on the Red Power Switch. I=ON
8. Replace the top cover and reinstall the screws.
NOTE: Hot tank must be filled prior to filling cold tank.
9. Select the Hot Button and the Dispense Button to allow water to flow until water is clear.
CUBE Operating, Installation, and Service Manual

PRE-INSTALLATION PROCEDURES

Page 17 - Revision: 6-23-2015

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents