IBM TotalStorage 300 Service Manual page 81

Model 325
Hide thumbs Also See for TotalStorage 300:
Table of Contents

Advertisement

2. Release the left and right side rack latches and pull the engine out of the rack
enclosure until both slide rails lock.
3. Lift the cover-release latch. Lift the cover off and set the cover aside.
Attention:
For proper cooling and airflow, replace the cover before powering
on the engine. Operating the engine for extended periods of time (over 30
minutes) with the cover removed might damage components.
To remove the bezel, perform the following steps:
1. Press in on the top sides of the bezel and pull the bezel away from the front.
2. Store the bezel in a safe place.
Installing optional adapters
See page 69 for the location of the PCI expansion slots on the system board.
Note: The illustrations in this document might differ slightly from your hardware.
Adapter considerations: Before you install any adapters:
v Determine which expansion slot you will use for the adapter.
– The second IBM FAStT Host Adapter (Fibre Channel) must be installed in slot
4, a 64-bit PCI slot.
– The first IBM Gigabit Ethernet Server Adapter must be installed in slot 3. If
you are installing a second IBM Gigabit Ethernet Server Adapter, it must be
installed in slot 4. Both slot 3 and slot 4 are 64-bit PCI slots.
– An IBM 10/100 Ethernet Server Adapter can be installed in any open PCI slot
(either a 32-bit or a 64-bit PCI slot).
®
– The Netfinity
Advanced System Manager PCI Adapter must be installed in
PCI slot 1, a 32-bit PCI slot.
For more information about determining which PCI slot to use, see "Appendix C.
PCI Adapter Placement" on page 131.
v Have a small, flat-blade screwdriver available.
Attention:
Check the instructions that come with the adapter for any requirements
or restrictions.
Installing an adapter: Refer to the following illustration to install an adapter.
Chapter 5. Installing and replacing IBM NAS 300 components
71

Advertisement

Table of Contents
loading

Table of Contents