Extend The Server From The Rack; Remove The Air Baffle - HP ProLiant ML350 Gen9 User Manual

Hide thumbs Also See for ProLiant ML350 Gen9:
Table of Contents

Advertisement

Connect each power cord to the server.
6.
Connect each power cord to the power source.
7.
Power up the server (on page 29).
8.
Do one of the following:
9.
For tower models, install the tower bezel (on page 31).
o
For rack models, if removed, install the security bezel
o

Extend the server from the rack

WARNING:
adequately stabilized before extending a component from the rack.
Remove the security bezel
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Loosen the screws from the latch ears and release the latches on each side of the server.
3.
Extend the server from the rack.
4.
After completing the maintenance procedure, slide the server back into the rack, and then press the
5.
server firmly into the rack to secure it in place.
WARNING:
latches and sliding the server into the rack. The sliding rails could pinch your fingers.

Remove the air baffle

To reduce the risk of personal injury or equipment damage, be sure that the rack is
("Remove the security bezel
To reduce the risk of personal injury, be careful when pressing the server rail-release
("Security bezel
option" on page 48).
(optional)" on page 30).
Operations 33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents