Enerzone Destination 1.5 Installation And Operation Manual page 55

Table of Contents

Advertisement

Note that secondary air tubes (A) can be replaced without removing the baffle board (B).
Important Notes:
The air tubes are identified for placement as follows:
Model
Type of tube
Destination 1.5 insert
Front ► 42 holes of 0.141"
Middle ► 42 holes of 0.141"
Rear ► 42 holes of 0.141"
Destination 1.5 Insert Installation and Operation Manual
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Destination 1.5 insert

Table of Contents