Enerzone Destination 1.5 Installation And Operation Manual page 44

Table of Contents

Advertisement

Using a power driver with a hex head 5/16" (8 mm), secure the base with 3 screws (D) on each
side of the insert.
Install the 4 leveling bolts (E) in the nuts located at the bottom of the insert with a 1/2" (13 mm)
wrench.
Destination 1.5 Insert Installation and Operation Manual
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Destination 1.5 insert

Table of Contents