Operation
Chapter 2 Operation
A display-guided installation program takes care of initial
setup after delivery from the factory.
2.1
Switch on coffee machine
Press ON / OFF button
Coffee machine switches on and heats up.
When the machine is ready to dispense beverages, the
ready to operate display appears.
2.2
Dispensing beverages
Pressing the beverage button triggers dispensing of the
beverage selected.
Lit up button
y
Flashing button
y
Unlit button
y
Place a suitably sized beverage receptacle below the
dispenser
Press desired beverage button
Desired beverage and progress of dispensing indicated
on the display.
2.3
Decaf button (optional)
Preparation of a decaffeinated coffee beverage from the
decaf grinder:
Press Decaf button
Press the desired beverage button
The steam dispensing option is not available with the
decaf option.
10
and hold for 2 seconds
=
Ready to dispense
=
Beverage dispensing
=
not ready to dispense /
button disabled
www.schaerer.com
Initial Startup
w Installation Instruction
PIN protection
w Software
w Settings
w Operating options
page 32
w Timer program
page 20
Hot liquids in the
dispensing area.
Observe the Safety
chapter.
Button allocation
w Software w Settings
w Recipe and beverage
buttons
page 28
User Manual SCF - EN
03.2010 / Edition 07
Need help?
Do you have a question about the Coffee Factory and is the answer not in the manual?