Loading Top Supply Roll - Gfp 255 C Operating Manual

Hide thumbs Also See for 255 C:
Table of Contents

Advertisement

14. Loading Top Supply roll

1. Slide the top supply roll onto the top, rear Supply unwind shaft
a. If using Liner-in film, the web should come off the bottom of the roll,
for Liner-out film the web should come off the top of the roll
( see threading diagram in #15)
2. Position the roll in the middle of the supply shaft. ( Position the same distance
from the roll to the side frame as the bottom roll in section #13 to align the top
and bottom rolls)
3. Adjust the brake tension by turning the Tension adjustment know
(Note: the brake tension should not prevent roll from turning)
4. Slide empty cardboard tube onto the top, front Liner rewind shaft
ote: When viewed from the rear, both the Core Clips on the top of each
shaft should point I WARD for liner-in film and OUTWARD for Liner-
Top Liner rewind tube
Bottom Supply unwind shaft
Gfp 255 C
out film
Top Supply unwind shaft
18
June 2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents