Installation; Remove Crate Top And Stand Components; Remove The Crate - Gfp 563TH-4 Operating Manual

Table of Contents

Advertisement

10. Installation

10A. Remove crate top and stand components
1. Remove screws around the top of the crate
2. Remove the top supports and stand components, set aside
Top supports
10B. Remove the crate and set aside
1. Remove all the screws including the corner protectors around the bottom of the crate
2. Lift up and over the machine and set the crate off to the side
Gfp 563TH-4
11
Stand components

Advertisement

Table of Contents
loading

Table of Contents