OUTPUT RECTIFIER BRIDGE REMOVAL AND REPLACEMENT (continued)
PRIMARY HARNESS ASSEMBLY (BLACK)
13. For reassembly, attach the glastic insulat-
ed angle mounting pieces to the heat sink
first. Slide the bridge into position and
then fasten the bottom tab to the sub-
frame with the bolt, split-ring lock washer
and nut. Then attach and tighten down
the top and bottom bolts that hold the
heat sink on both sides of the machine.
14. Reconnect the leads on both sides of the
bridge. Install new cable ties according to
Figure F.72.
TROUBLESHOOTING & REPAIR
FIGURE F.72 – CABLE TIE LOCATIONS
POWER WAVE 450
SECONDARY HARNESS ASSEMBLY (WHITE)
15. Install the machine case sides and top.
16. Install the handle and the lift bail rubber
gasket.