Hardware Platforms
ECDIS. Then it is required to switch from Planning to Monitoring mode as described above to
access all route monitoring functions.
Planned routes
When routes have been planned on a Planning station, they can be copied to another ECDIS
workstation. Right click on the route and access menu "Synchronize". Route will be copied to
all active ECDIS workstations. Alternatively it's possible to import route using the following
procedure:
On the target PC, open the dialogue Load/Unload objects panel Routes and press
•
Import
Select the folder containing the route located on the Planning station: C:\\
•
ECDIS_userdata\Routes
Select Routes to be imported
•
Press OK and the routes are copied on the local PC.
•
Another way to copy a route is: right click on the route, select Synchronize; the route is
copied to all active ECDIS workstations.
A
CTIVE ROUTE
A route can be activated only on the Monitoring workstation. When the route has been
activated, it will be automatically transferred and displayed to the other ECDIS workstations
running on the LAN.
I
MPORTANT
Activation of route is possible only on monitoring workstation.
C
HARTS
To synchronize ENC or ARCS charts collections use "Copy database" function available in the
chart handling dialogue.
MARIS ECDIS computers come in several variants:
Flat panel computer MK15/16:
•
MARIS ECDIS900 MK15 24" 4S
•
MARIS ECDIS900 MK16 19" 4S
•
MARIS ECDIS900 MK5 is delivered with 2 diffident monitors:
•
MARIS ECDIS900 with Hatteland 24" monitor
•
MARIS ECDIS900 with Hatteland 26" monitor
•
For more information about hardware see "MARIS ECDIS installation Manual", Chapter 1
5
H
P
ARDWARE
LATFORMS