H3C S5810-50S Installation Manual page 30

S5810 series
Hide thumbs Also See for S5810-50S:
Table of Contents

Advertisement

Figure 3-7 Connect the PGND cable to the grounding hole of switch
(1) Rear panel of the switch
(3) Grounding hole
(5) PGND cable
To attach the other end of the PGND cable to the grounding strip in the equipment room, follow these
steps:
Step1 Cut the PGND cable to a proper length according to the distance between the switch and the grounding
strip.
Step2 Peel 5 mm (0.20 in.) of insulation sheath using a wire stripper, and then insert the naked metal part
through the black insulation covering into the end of the OT terminal. (Two OT terminals are provided
with the PGND cable when shipped with the switch; select a proper OT terminal according to the size of
the grounding post.)
Step3 Secure the metal part of the cable to the OT terminal with a crimper, and then cover it with the insulation
covering. Then heat the insulation covering with a blowing machine to let it completely cover the metal
part.
Step4 Connect the OT terminal to the grounding pole of the grounding strip, and then fasten it with a hex nut.
Figure 3-8 Connect the ground wire to the grounding strip
(1) Grounding post
(3) PGND cable
(2) Grounding sign
(4) OT terminal
(6) Grounding screw
(2) Grounding strip
(4) Hex nut
3-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5810-50s-dc

Table of Contents