D. Commissioning
14
D. Commissioning
This chapter describes the steps required to commission the product.
Remove the protective film from the display.
The measuring instrument is supplied with a rechargeable battery already fitted.
Charge the rechargeable battery up fully before using the measuring instrument
(see Charging batteries , p. 16).