Checking For Leaks During Operation - Buderus Logano GE434 Maintenance Instructions Manual

Table of Contents

Advertisement

6
Heating system start-up

6.1.9 Checking for leaks during operation

! Test all sealing points on the entire burner gas route
with a foaming leak detector agent, whilst the burner
operates, e.g.:
– test port,
– nozzles,
– plugs, etc.
The agent must be approved for gas leak testing.
SYSTEM DAMAGE
through short circuits.
! Cover areas at risk before searching for
CAUTION!
leaks.
! Never apply leak detector spray to
cableways, plugs or electrical leads.
Never let any spray drop down onto
such areas.
Country
AT, BA, BE, BG, BR, BY, CH,
CN, CZ, DE, DK, EE, ES, FI,
FR, GB, GR, HR, IE, IT, LU,
PL, PT, RO, RU, SE, SI, SK,
TR, UA
NL
HU
AT, BY, CH, CN, CZ, DE, ES,
GB, HU, HR, IE, LU, NL, PL,
PT, RO, RU, SI, SK, TR, UA
CZ, ES, FR, IE, PL, PT, SK
BA, BG, GR, HR, LU, TR
Tab. 13 Gas types and supply pressures
*
When the auxiliary gas pressure switch is installed, the system may be operated for short periods at a max. of 10 mbar.
We reserve the right to make any changes due to technical modifications.
Commissioning and maintenance instructions Logano GE434 Gas-fired special boiler • Issue 02/2003
26
Gas type
Natural gas H
(G20)
Natural gas L
(G25)
Natural gas
GZ 50
Natural gas L (G25)
Natural gas H
(G20)
Natural gas S
(G25.1)
LPG P
Propane (G31)
LPG P
Propane (G31)
LPG B/P
(G30)
Supply pressure
Min.
rated
mbar
mbar
*
16
20
*
20
25
*
20
25
42,5
50
25
37
42,5
50
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
Max.
mbar
25
30
33
57,5
45
57,5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents