TRANSFERRING THE PROJECT
STEP2
2. CONNECTING THE GOT AND THE PLC
55
2. CONNECTING THE GOT AND THE PLC
2
3
5
4
Touch [Maintenance] → [Ethernet status
2
check] on the utility main menu.
Set the IP address of the target controller and
3
touch the [Ping transmission] button.
In this document, the IP address of the target
controller is 192.168.3.39 (default).
The IP address of the target controller can be
checked and changed in [Ethernet Setting] by
selecting [Common] → [Controller Setting]
from the menu bar of GT Designer3.
When no communication error exists, the message
[Response received.] appears.
Touch the [OK] button.
4
Touch the [×] button to display the created
5
screen.