Mitsubishi Electric GOT2000 Series Quick Start Manual page 50

Mitsubishi graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

CREATING A PROJECT
STEP1
5. CHECKING THE CREATED SCREEN
Click!
6
The simulator can be started, updated, and exited from the toolbar of GT Designer3.
(1) [Simulator: Activate]
Activates GT Simulator3 to start the simulation.
(2) [Simulator: Update]
Updates the project in simulation with the project being edited.
The changes made by using GT Designer3 can be reflected to the project in simulation.
(3) [Simulator: Set]
Opens the setting window of the simulator.
(4) [Simulator: End]
Exits GT Simulator3.
47
5. CHECKING THE CREATED SCREEN
The lamp turns on
and the value
7
changes to 6666.
(1)
(2)
(3)
The simulator starts, and the created screen can
be simulated.
Click the RUN button.
6
The Running lamp turns on and the value of
7
Data 1 changes to 6666.
(4)