Mitsubishi Electric GOT2000 Series Quick Start Manual page 55

Mitsubishi graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

3. Transferring the project data
Transfer the project data from the personal computer to the GOT.
Click!
8
Click!
9
TRANSFERRING THE PROJECT DATA
1. TRANSFERRING THE PROJECT DATA
Check "Write Data: Package Data"
and "Destination Drive: C:Built-in
Flash Memory".
6
Click!
7
Check that the following settings are
6
configured.
Write Data: Package Data
Destination Drive: C:Built-in Flash Memory
Click the [GOT Write] button.
7
The dialog for confirming writing to the GOT
appears.
Click the [Yes] button to start writing.
8
The dialog shown left is displayed while the data is
written.
Do not perform the following operations.
• Turning off the GOT
• Unplugging the cable
• Opening the SD card cover
When writing to the GOT is completed, the
9
dialog shown left appears. Click the [OK]
button.
1. TRANSFERRING THE PROJECT DATA
52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents