REMEHA Gas 310 ECO Technical Information page 15

Hide thumbs Also See for Gas 310 ECO:
Table of Contents

Advertisement

fig. 05 Layout in the boiler room
04.31H.79.00005
* Free space 800 mm, if instrument panel is facing the
short side.
Number of sections
5
6
7
8
9
Clearance of at least 800mm is required at the front
(service side) of the boiler. However, we recommend a
clearance of 1 m. A clearance of at least 400mm above
the boiler, at least 300mm on both ends (800mm if the
instrument panel is rotated to face the short end).
fig. 06 shows the boiler's support area including the
position of the support pads (shaded boxes) supplied.
Supplied By www.heating spares.co Tel. 0161 620 6677
C in mm
1590
1590
1980
1980
1980
fig. 06 Support area Remeha Gas 310 ECO
00.31H.79.00005
table 03 longitudinal dimensions
16
Remeha Gas 310 ECO
Number of sec-
C in mm
tions
5
1590
6
1590
7
1980
8
1980
9
1980
D in mm
1118
1118
1508
1508
1508

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents