Plan Of Installation - Concrete Pads - Viking Q-4 Installation Instructions Class Ii, Class Iii, And Class Iv Heavy-Duty Commercial Vehicular Slide Ga

Heavy-duty commercial vehicular slide gate operator
Table of Contents

Advertisement

PLAN OF INSTALLATION – CONCRETE PADS
PLAN OF INSTALLATION – CONCRETE PADS
10"
Install a
Positive Stop
at Both Ends
24"
of the Track
Operator Chassis
Center of
Drive Chain
11.75"/13.75"/15.75"
6"
24"
See Note 1
Below
1. Follow the local building code to determine the required depth of the concrete pad.
2. Pad measurements recommended by Viking Access Systems are at lease 24" long,
18" wide and 24" deep to ensure the stable operation of the operator, and a
minimum of 4" above level grade to avoid any flooding of the machinery.
3. The path of the track must be 10" wide and at least 6" deep to support the
weight of the gate. Please consult the local building code for verification and
further details.
4. Provide a sufficient number of conduit pathways for all low power accessories
such as loop detector leads, maglock, non-contact sensors, contact sensors, safety
and other commands. Also provide conduit for the power supply (either 110 or
220 VAC). Extend the conduit the recommended height of 1" above the level of
the concrete pad. Install all conduit in the shaded area shown above.
TECHNICAL SUPPORT 1 800 908 0884
Track
Gate
28"
Drill for a 1/2" x 3-1/2"
Red Head Anchor
(4) Places
Minimum
2"
4"
Minimum
Track Concrete Pad
Gate Operator Concrete Pad
5.5"
13"
5"
Conduit Location
4"
Grade Level
See Note 2
Gate Operator Concrete Pad
Recommended
Area for
Conduit(s)
18"
Track Concrete Pad
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H-10

Table of Contents