Fireplace Installation Instructions - ORTAL Clear 40 Tunnel, Clear RS Tunnel Installation & Operation Manual

40 series; 70 series; 80 series; 110 series; 120 series; 130 series; 135 series; 150 series; 170 series; 200 series;
Hide thumbs Also See for Clear 40 Tunnel, Clear RS Tunnel:
Table of Contents

Advertisement

FIREPLACE INSTALLATION INSTRUCTIONS

Installation Checklist
1. Identify appliance installation location (based on the following):
2. Room location
3. Clearances to combustibles
4. Venting requirements
5. Mantle clearances
6. Framing and finishing requirements (surrounding framing and materials to be
completed after fireplace installation)
7. Put unit in place
8. Install vent
9. Make gas connections
10. Make electrical control connections to receptacle supplied with unit
11. Install standard and optional features
a. Remove glass (see instructions for handling glass on page 72)
b. Place, lay-in interior design media (see page 74)
c. Re-install glass, including sealant where there are glass to glass
connections
12. Test
a. Gas Pressure
b. Pilot
c. Burner
13. Complete framing and cover wall
a. Vent openings/louvers for air circulation
i. Above and below firebox
b. Access doors for service
i. Place spare label on interior side of access door
14. Final check
15. Before releasing unit to customer for use without installer supervision, the
installer must:
a. Ensure that the appliance is burning correctly
b. Review and explain unit operation to customer
c. Review and explain safety warnings to customer
d. Review and explain to customer that glass is hot during and after operation
e. Review and explain maintenance requirements to customer
f. Review and explain warranty requirements to customer
70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents