Thermocouple - ORTAL Clear 40 Tunnel, Clear RS Tunnel Installation & Operation Manual

40 series; 70 series; 80 series; 110 series; 120 series; 130 series; 135 series; 150 series; 170 series; 200 series;
Hide thumbs Also See for Clear 40 Tunnel, Clear RS Tunnel:
Table of Contents

Advertisement

APPENDIX E

Thermocouple

Thermocouple check list Refer to figure 7A
1) Place new batteries are in the receiver.
2) Check for any breakage to the thermocouple from pilot assembly to the valve.
3) Confirm the thermocouple is tight to the interrupter block and the thermo current
cable is securely touching the end of the thermocouple.
4) Confirm the interrupter block is screwed in to the valve properly and finger tight.
5) Confirm thermo current cable TC is screwed in to the receiver properly and tight.
6) Confirm thermo current cable SW is screwed in to the receiver properly and tight.
7) Confirm the thermo current cable SW is securely place in the interrupter block.
7 |
A p p e n d i x E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents