Fireplace Sequence Of Operation - ORTAL Clear 40 Tunnel, Clear RS Tunnel Installation & Operation Manual

40 series; 70 series; 80 series; 110 series; 120 series; 130 series; 135 series; 150 series; 170 series; 200 series;
Hide thumbs Also See for Clear 40 Tunnel, Clear RS Tunnel:
Table of Contents

Advertisement

Fireplace Normal Sequence of Operation
1. Turn the fireplace on by pressing the off and flame up button simultaneously.
(button 1&2 of figure 4A)
2. System will check itself for any electrical trouble. This is accompanied by
sequential beeps. (If there is a fault, weak batteries , the on/off switch is off, a
single long beep will sound. See figure 3A for location of on/off switch)
3. Once the system check is ok it will initiate spark to the pilot and open gas to the
pilot.
4. Once the pilot is on, the pilot will heat up the thermocouple.
5. When the thermocouple is heated to the specified temperature, it will allow the
flow of the mill volt to the valve.
6. Once the mill volt is detected by the valve, the valve will turn the solenoid for the
main burner on now the fireplace is fully on.
APPENDIX E
4 |
A p p e n d i x E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents