INSTALLATION
The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations, using two 90
Pipe vent systems for Propane and Natural Gas.
26
RIGID PIPE VENTING ARRANGEMENTS
VERTICAL TERMINATIONS
(Propane & Natural Gas)
•
Vent must be supported at offsets.
•
Firestops are required at each fl oor level and whenever
passing through a wall.
•
Maintain clearances to combustibles.
Note: Must use optional rigid pipe adaptor when using
rigid vent systems (Part # 510-994).
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
o
elbow, with Rigid