Install The Header Bracket - B&D Easylifter Instructions Manual

Hide thumbs Also See for Easylifter:
Table of Contents

Advertisement

INSTALLATION STEP 2

Install the Header Bracket

WALL HEADER BRACKET INSTALLATION
• Centre the bracket on the vertical guideline with the
bottom edge of the bracket on the horizontal line
(with the arrow pointing toward the ceiling).
• Mark all of the bracket holes. Drill 4.5mm (3/16")
pilot holes and fasten the bracket with wood
screws. For concrete mount, use concrete anchors
provided.
HARDWARE SHOWN ACTUAL SIZE
Lag Screw
8mm x 40mm
Anchors
8mm x 40mm
CEILING HEADER BRACKET INSTALLATION
• Extend vertical guideline onto the ceiling.
• Centre the bracket on the vertical mark no more
than 150mm (6") from the wall. Make sure the
arrow is pointing toward the wall.
• Mark all of the bracket holes (5). Drill 4.5mm (3/16")
pilot holes and fasten the bracket with wood
screws. For concrete ceiling mount, use concrete
anchors provided.
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket
Cei l ing Mounting Holes
CEILING MOUNT ONL Y
UP
14
Bracket Holes
Bracket Holes
Header
Wall
25mm
Board
Header
Bracket
50mm
(2")
Highest Poin t of
Garage Door Travel
15cm Maximum
Door
Spring
Gar age Door
Vertical
Centreline
Lag Screws
8mm x 40mm
Garage
Door
Vertical
Centreline
Finished Ceiling
Header
Vertical Cen treline
Bracket
Lag Screws
8mm x 40mm
Header Wall
Vertical
Cen treline

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents