Regulations; Ec Regulations; Remeha Factory Test; Additional Guidelines - REMEHA Avanta 12v Installation & Service Manual

Avanta range
Table of Contents

Advertisement

7

REGULATIONS

7.1

EC regulations

The boiler meets the requirements of the EC regulations at the
following directives:
- 90/396EEC Gas appliances directive
- 92/42/EEC Efficiency directive
- 2006/95/EEC Electrical low voltage directive
- 2004/108/EEC EMC directive
- 97/23/EEC Pressure equipment directive (art. 3, sub. 3)
Classification type for evacuation of the combustion products;
according EN 483
7.2

Remeha factory test

Before it leaves the factory, each Remeha Avanta boiler is
optimally adjusted and tested for:
- electrical safety;
- CO2- adjustment;
- hot water function
- water tightness;
- gas tightness;
- automation parameters.
7.3

Additional guidelines

In addition to the regulations and guidelines as mentioned in
par. 7.1 the following guidelines in this documentation should
also be observed.
It applies for all regulations and guidelines, mentioned in this
Installation and Service manual, that any additions or new
regulations and guidelines at the time of installation will also
apply.
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avanta 18vAvanta 24v

Table of Contents