n . 1
m i
fig. 03
Clearance requirements
fig. 04
Dimensions and connection points of the Remeha
Avanta
4 0
0
m i
n .
2 5
0
6 0
0
m i
n .
2 5
0
0
2 9
0
0 0
59970LTGBW7H047
400
317
50
160
85
206
59970.LT.GB.W7H.001
Clearances shown are for ease of installation – once fitted it is
possible to enclose the boiler in a cupboard with 25mm clear-
ances around the casing provided a door is included to allow
the front cover to be removed completely for maintenance and
allowance is made to access the gas valve and flow / return
connections.
2.2.2
Dimensions and connection points.
Return connection Ø 22 mm
Flow connection Ø 22 mm
Gas connection Ø 22 mm
Combustion air inlet Ø 100 mm (concentric)
Flue duct Ø 60 mm (concentric)
Condensate drain connection ¾"
(standard overflow pipe size)
•
Based on the guidelines and the required installation
space, determine where to mount the Remeha Avanta.
•
In determining the boiler position, consider carefully the
flue outlet position and any pluming consequences.
8
Remeha Avanta