Installation; Scope Of Delivery; Mounting The Boiler; Installation / Maintenance Clearance Requirements - REMEHA Avanta 12v Installation & Service Manual

Avanta range
Table of Contents

Advertisement

2

INSTALLATION

fig. 02

Scope of delivery

2.1
The standard delivery of the Remeha Avanta boiler includes:
- Boiler + mounting bracket
- Installation and Service manual, Quick reference card and
Mounting Template
- Warranty Leaflet (The terms and conditions of the warranty
are included in the warranty leaflet, on installation of the
boiler please fill in the registration card and return to Broag-
Remeha)
- Wiring diagrams
- Gas cock with gasket + 90° gas pipe ( 22 mm)
- nylon plugs and screws for fixing mounting plate
- olives and nuts
- spacers
- cable glands;
This Installation and Service manual deals with the standard
supplied boiler only. For the installation or assembly of any
optional accessories supplied with the boiler, such as stand off
frame, pipe work kits, cover plate, control kits, etc, please refer
to the Assembly Instructions supplied with these accessories.
2.2
Packed in the box with the Remeha Avanta box is this Instal-
lation and Service manual. Read instructions and remarks
carefully. This section includes the guidelines and instructions
for the connection of gas, water, electricity, safety devices, the
regulator, control unit, flue discharge and air supply.
59970.LT.GB.W7H.006
2.2.1
The gas connection is located on the bottom of the boiler
whilst the water connections, air inlet and flue gas outlet are
located on the top of the boiler. The boiler is supplied as
standard with gas pipe work tails.
For installation, servicing and inspection min. 600 mm in front
of the boiler is required. If this free space is obtained by open-
ing a door or removing a panel, the boiler may be installed
for instance in a closed cupboard. All servicing / inspection /
repairs are made from the front of the boiler.
For ease of installation we recommend clearances of 0.5 cm
at the side so that the unit is easy to open, with a free space
of 25 cm under the appliance and 25 cm above the appliance,
as the minimum requirement.
However once installed, it is possible to reduce these clear-
ances to 22 cm at the top, and 25 cm at the bottom provided
the boiler front panel can be removed and the isolating valves
are easily accessible without the use of tools"
7
Scope of delivery

Mounting the boiler

Installation / maintenance clearance requirements

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avanta 18vAvanta 24v

Table of Contents