The procedure for installing the interface board to each slot is as follows:
1) Check the exterior of the interface board for any damage.
2) Align each interface board to the guardrails of the universal slot of the OfficeServ 7200
main cabinet or expansion cabinet, and slide the interface board into the slot.
* For PLIM/PLIM2 to operate as a managed switch, it must be installed in slot 2 of either
cabinet and a WIM must be installed in slot 1 next to the PLIM/PLIM2.
3) Push the front panel lever of the interface board until the board is completely inserted
into the OfficeServ 7200 slot.
Figure 3.12 Installing Interface Board into Slot
Figure 3.13 Front Panel Lever
3.15