3.13 Line Tests

This mode offers several internal tests and the ability to monitor certain unit output functions. Included are
relay tests, modem signal output monitoring, and DTMF output monitoring.

3.13.1 Relay Test

This mode tests the on/off operation of various relays and switches.
1. Press MENU, *, 1, 2.
2. Press the numeric keypad 0 (zero) to select the main board.
To select the optional board number for the second phone line, press 1 (one).
Then press ENTER.
3. Select "Relay Test", then press ENTER.
A list of abbreviations representing the various relays and switches will appear in the display.
4. Select the relay you want to set to ON by cursor key, then press ENTER. When it is set to ON, it will be
shaded. If you want to set it to OFF, select relay and then press ENTER again.
5. Press STOP to exit the relay test mode, and the machine will return to the standby mode.