Seagull Models EDGE 540 Instruction Manual page 6

Seagull models
Hide thumbs Also See for EDGE 540:
Table of Contents

Advertisement

EDGE 540
Instruction Manual
M2 lock nut.
Wing bottom.
Repeat the procedure for the other wing.
ELEVATOR - RUDDER CONTROL HORN
M3 lock nut.
M3 control horn.
INSTALLATION.
M3 nut.
1) Install the elevator control horn using
the same method as with the aileron control
horns.
Aluminium washer.
2) Position the elevator control horn on
Wing bottom.
the both side of elevator.
2 sets.
M2 clevis.
M2 lock nut.
Snap keeper.
3x35mm.
Wing.
Aileron.
Aileron control horn.
4) Install the rudder control horn using the
same method as with the elevator control
Wing bottom.
horns.
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents