Test Phone; Guidelines; Installation - Panasonic DBS 40 Manual

Digital business system
Hide thumbs Also See for DBS 40:
Table of Contents

Advertisement

Chapter 3. Cabinet Installation

Test Phone

Guidelines

l
l
l
I n s t a l l a t i o n -
1. Connect the telephone and DSS (optional) to CN3 on the Connector
2. Set SW 1 to "Test."
3. When programming is completed, set SW 1 back to "ST."
3-1 a
The test terminal (CN3) on the DBS Connector Panel can be used to
connect a display phone for programming.
The test terminal can be used for initial programming before extension
cabling is completed.
The test terminal is turned on by flipping SW1 on the Connector Panel to
the "Test" position. When SW 1 is in the test position, extension ports 7 and
8 are connected through the test terminal. When SW1 is not in the test
position, extension ports 7 and 8 are connected through the MDE
Note: Before using the test terminal on a DBS that is operational, be sure
the phones connected to ports 7 and 8 can be taken out of service.
A DSS/72 can be connected to the display phone for text entry. Port 7 must
be assigned as extension 101 and the DSS/72 must be assigned as
telephone type 13 for the DSS/72 to operate.
Panel. (See Figure,3-18 on page 3- 19.)
Section 3004nstallation

Advertisement

Table of Contents
loading

Table of Contents