Oil Pump Control Cable; Ignition Timing - Honda MB5 1982 Shop Manual

Hide thumbs Also See for MB5 1982:
Table of Contents

Advertisement

INSPECTION AND ADJUSTMENT
OIL PUMP CONTROL CABLE
NOTE
The oil pump control cable should be adjusted
after the throttle grip free play has been
adjusted.
Loosen the lock
nut.
With the
throttle fully open,
align the index mark on the
pump body
with the
reference mark on the control
lever
by
turning
the
adjusting nut.
Tighten
the lock nut.
CAUTION
The index mark on the control lever must be
in line with the reference mark on the pump
body toward the CLOSE side. Failure to do so
reduces the pump delivery, resulting
in
serious
engine damage. When adjusting the index
mark, it may be within 1 mm ( 0. 04 in) out of
line with the reference mark toward the
OPEN region.
Excessive
white smoke or hard starting:
Pump control lever excessively open
Burnt
piston: Pump
control·
lever
not
opened
properly
IGNITION TIMING
NOTE
The CDI ignition timing is not adjustable.
If the ignition timing
is
incorrect, check the
CDI unit and alternator and replace any faulty
parts.
Remove the
left
crankcase cover.
Connect a stroboscopic
timing light
to the high
tension wire.
Start the engine and bring engine speed to 3,000
rpm.
Aim the timing
light
at
the timing mark.
The "F"
mark should
align with
the
index
m~rk.
Bring engine speed to
6500-7500
rpm
and check
that the index mark
is
between the full retard
marks.
3-6
-
- - - - - - - - - - - - - - - - -
OIL
PUMP
CONTROL CABLE
~HONDA
~
MBS
ADJUSTING
NUT
OPEN
SIDE
LOCK NUT
INDEX
MARK
"F" MARK
28
TIMING LIGHT
INDEX
MARK
INDEX MARK
RETARD MARKS
Date of Issue:
July,
1981
©
HONDA MOTOR CO., LTD.

Advertisement

Table of Contents
loading

Table of Contents